How to Calculate Production per Hour in Excel (4 …
Explanation: C5 represents the Total Production Units.; E5 represents the Number of Factories.; D5 corresponds to the Total Elapsed Time (in hours).; The ROUND function ensures the result is rounded to the nearest …
اقرأ أكثر



ANALYSIS OF AVAILABILITY AND UTILIZATION OF …
It represents the period for which the machine is available for work. Total the number of hours the machine is not available for use within that day or shift includes the number of hours the machine requires for servicing and/or repairs. Utilization (U) signifies the use of available hours for actual working in the field. A machine may
اقرأ أكثر



EFFECTIVE EQUIPMENT UTILISATION
the effective operational working hours of the mining equipment. The following KPI's are measured and reported to manage effective equipment utilisation: •Equipment Availability – …
اقرأ أكثر



Mining
The document provides cost estimates for mining operations at three different distances from the mine site (500m, 1000m, 1500m). It estimates costs for equipment rental, fuel consumption, and per bank cubic meter or tonne production. The total estimated mining cost increases with distance from around $330k/BCM at 500m to over $410k/BCM at 1500m. Similarly, the estimated cost …
اقرأ أكثر



How To Calculate Tons Per Hour Crusher Machine
calculation of tonnes per machine shift in mining Crushing Machine Of 300 Ton Per Hour For Sale In Uk -, ... jaw crushing stone crusher in south africa,mining equipment stone calculator . Chat Now; stone crusher 300 ton perhour - galgotiasbschoolin. used machinery stone crusher 300 tons per hour 200 mesh like High Gradrient Magnetic Separator ...
اقرأ أكثر



(PDF) Applicability of Continuous Miner in Room and Pillar Mining …
in operation).Indian Coal Mines Regulations require 6 cubic metres per minute of air per pe rson employed in the largest shift or 2.5 cubic metres per minute of a ir per daily tonne of output ...
اقرأ أكثر



The productivity of lhd in underground coal mines | PPT
The document then calculates the productivity of LHD machines in different coal seams and faces based on machine parameters, haul distances, and cycle times measured from observational data. Productivity is found to range from 103-452 tonnes per day depending on the specific mining conditions and face layout.
اقرأ أكثر



Optimization of the fleet per shovel productivity in …
This paper presents a methodology to calculate and optimize the selection of loader to truck combination by minimizing the total haulage costs. The proposed methodology consists of: (i) formulation of oriented mathematical …
اقرأ أكثر



Significance and measurement of coal mine productivity
Labor productivity (short tons per labor shift) is most commonly used in the coal mining industry as a measure of changes in labor efficiency and as an indicator of the …
اقرأ أكثر



Common & Basic Formulas for Mineral Processing …
Pulp Densities. Pulp densities indicate by means of a tabulation the percentages of solids (or liquid-to-solid ratio) in a sample of pulp. This figure is valuable in two ways—directly, because for each unit process and operation in milling the optimum pulp density must be established and maintained, and indirectly, because certain important tonnage calculations are …
اقرأ أكثر



How To Calculate Per Ton For Stone Crusher Machine
Crusher Run calculator | Gravel Calculator and Density and … Gravel Base Calculator m3/ton Crushed Limestone calculator m3/ton Crusher Run calculator m3/ton. Enter Postcode To see price and selection. Start. Products. Soil & Dirt (7) Slate (11) Sand (26) Rockery & Boulders (15) ...
اقرأ أكثر



Calculate Ore Tonnage and Grade from Drill hole Samples
The increase in the tonnage of copper by the Harding angular method proved to be more than 54,000 metric tons, and the percentage of copper per ton was also increased by 0.024 per cent. I worked out all the prisms, about 300, by the Harding angular method and by the standard method, and checked the results in each case by the geometrical method.
اقرأ أكثر



Common & Basic Formulas for Mineral Processing …
The value of the ore by "perfect concentration" is calculated by setting up perfect concentrates, liquidating these according to the same smelter schedules and with the same metal prices, and reducing the results to the …
اقرأ أكثر



LHD-LPDT cycle time optimization of underground metal mine
The invention of LHDs can be said to be a milestone in mining. Ever since its inception, the load-haul-dumper become a dominant machine in mechanized mines and plays an important role in overall mine production [1]. LHDs are very reliable and powerful machines, capable of working in the most hostile of conditions.
اقرأ أكثر



Output Per Man Shift (OMS) of UG and OC mining methods …
Output per man-shift (OMS) is another measure of the efficiency and productivity of a mine or a particular mining method. It gives an idea about the efficiency and feasibility of a specific method ...
اقرأ أكثر



Dynamic short term production scheduling and machine allocation …
The cost of transporting mined materials in an underground mine is major. This cost typically represents between 50 to 60 percent of a mine's total operating costs.
اقرأ أكثر



calculation of tonnes per machine shift in mining
calculation of tonnes per machine shift in mining How to Calculate Overall Equipment Effectiveness: A ... 2017/05/25· Machine downtime = 60 minutes per shift Total = 180 minutes …
اقرأ أكثر



Cost Estimation Handbook I for Small Placer Mines
pound per loose cubic yard pound per yard pound per cubic yard loose cubic yard loose cubic yard per year LCYh w min minh st st/h tr oz tr odydJ wt45 Y& yda y da/d yd'lft' yd'h F loose cubic yard per hour micrometer minute minute per hour short ton short ton per how troy ounce troy ounce per cubic yard weight percent yard per hour cubic yard
اقرأ أكثر



(PDF) METHOD FOR CALCULATION OF DRILLING-AND …
Purpose. Development of a new method for calculation of drilling-and-blasting operations parameters during underground mining with application of emulsion explosives taking into account their ...
اقرأ أكثر



Ministry of Coal, Government of India
In mining, OMS is one of the measures of efficiency for the production. Details of OMS Calculation (i) Calculation for UG OMS = Coal Production/ Manshift (ii) Calculation for Open Cast OMS = …
اقرأ أكثر



Optimization of the fleet per shovel productivity …
It can be calculated by using Equation (21). Qd = Qdump ⋅ Nshift (21) where: Qdump = Productivity of a truck per shift; Nshift = Number of shifts. 4.14. Number of dump trucks per shift This is the estimated number of dump trucks that can …
اقرأ أكثر



3 Calculation of Volume and Tonnage of Ore Deposit
a Vertical section to calculate the true thickness of a drill intersection. b Plan and section to calculate the true thickness from a drill hole running oblique to strike. c Block diagram to calculate the apparent dip angle From the horizontal plan in Fig. 4b, with n being the apparent horizontal
اقرأ أكثر



How to Calculate an Open Pit Mine Capacity
The length of the shift is 480 min. with 3 medium length interruptions of each 30 min's duration. The estimate of costs can be made by including wages, ownership and costs per ton and ton x mile for energy and …
اقرأ أكثر



mining machine c1101 00 tonnes per hour
Contribute to lbsid/en development by creating an account on GitHub.
اقرأ أكثر



Calculate TKPH (Tonne Kilometre Per Hour)
Load per tyre of an empty vehicle: 9,000 kg Load per tyre of a loaded vehicle: 15,000 kg Rotation hours per day: 8 hours Number of cycles per day: 15 cycles Distance per cycle: 14 km Mean tyre load = (9,000 + 15,000) / 2 = 12,000 kg (12 tons) Average work-shift speed = (14 km x 15 cycles) 8 = 26.25 km/h TKPH = 26.25 km/h x 12 tons = 315 TKPH
اقرأ أكثر



LEADING THE WAY IN MINING SHOVEL PRODUCTIVITY
The shovels were equipped with a 17.9 yd 3 (13.7 m ) bucket on the 6020B and a standard 10.6 yd 3 (8.1 m ) bucket on the 6015B. The competitive machines were outfitted with buckets as close in size as available – around 10.0 yd 3 (7.6 m ) on the and PC1250-8, and 17.8 yd (13.6 m3) on the PC2000-8. "We did everything we could, but …
اقرأ أكثر



n g i n e r in g &M Industrial Engineering & Management
In this article, we define in practical way all the terms entering into account in determining the availability, utilization, working and eficiency of mining equipment. We also give a very simple …
اقرأ أكثر



Optimization of the fleet per shovel productivity in …
via the excavator and dump truck combination. Whereas, a total mass of 4,000 tonnes of limestone is hauled to the plant as per daily target of production. 3.1. Calculations of the productivity backhoe excavator In surface mining operations were the daily productivity of the ore to be hauled to the plant has
اقرأ أكثر



Basic E&Mcalculations for a coal mining project | PPT
19. Drum Dia. mtrs 1.8 Web mtrs 1 Cutting speed, Vs mt/min 12.0 Density of coal (solid) T/m3 1.5 Q(Mining rate in tonnes per hour by one drum) TPH 1944 K is Specific energy consumption factor in HP-hr/Ton Normally K is 0.5 for hard coal and 0.25-0.35 for soft coal P(HP) = QK HP 972 There fore, for 3mtr extraction, the other drum requires only a power of (3 …
اقرأ أكثر



Applicability of Continuous Miner in Room and Pillar …
It is important to note that the continuous mining machine is crucial to both types of ... The cutter head usually loads around 8 tonnes per 500mm sump ... At the start of every shift the machine ...
اقرأ أكثر